CONSTRUCTION SERVICE

Tile & Wood Flooring

Waterfront Construction installs tile and wood flooring, from large-format porcelain with leveling systems to hardwood and engineered wood. Subfloor preparation comes first, because a flat, solid base is what keeps tile from cracking.

Large-format white tile being laid with red leveling clips beside new dark wood cabinets

When this is the right place to start

Best fit when floors are worn, damaged or mismatched, or a remodel needs new flooring throughout.

  • Subfloor inspection and leveling
  • Porcelain and ceramic tile, including large-format
  • Hardwood and engineered wood flooring
  • Baseboards and transitions between rooms

Useful details to have ready

  • The rooms and rough square footage
  • Photos of the current floors
  • The material you are considering

Common questions about tile & wood flooring

Why do tile floors crack?

Usually because the subfloor moves or was not flat. Proper preparation and the right underlayment prevent most cracking.

Can new flooring go over the old floor?

Sometimes, but it raises floor height and can hide problems. Removing the old floor is often the better base for a long-lasting result.

What is large-format tile?

Tile with at least one side 15 inches or longer. It needs a very flat floor and leveling clips, like the ones in our project photos.

Call 510-366-9020Send request